top of page
PROJECT 1:
Industrialised Building System
PROJECT OVERVIEW
This is a group assignment which predominantly relate to the topic of Industrialised Building System (IBS). Before embarking on this project students will be exposed to different types and methods of the IBS system and the calculation of IBS scoring in the classroom. Firstly, each group are required to design a 3-storey apartment block using mainly IBS components.
PROJECT OUTCOME
REFLECTION
Through this project, I have learned about IBS system and to evaluate a building construction using IBS scoring. This will be useful for my future projects and ideations.
bottom of page